AOC Capitol Police Headquarters

Washington, DC

- Project Cost: $6,000,000 

- Size:  SF

- Notable Features: Duct Pressure Control Optimization, Return Fan VFD Control Optimization, Dual Temperature Loop Shut Down, Dual Temperature Loop Summer-Winter Optimization, Energy Conservation to a Historic Structure

 

- Project Summary: Alphatec PC’s total A/E services include replacing controls for all of the pneumatic controls in the building and replacing these with new operators and BACnet controllers, providing new power connections for the fire pumps and fire pump enclosure on the first floor, and providing a new addressable fire alarm system throughout the facility. A new phase was also added to the design - new replacement switchgear rooms and equipment.