TSIF.jpg

TSA Systems integration facility Upgrades (TSIF)

Ronald Reagan Washington National Airport, Washington, DC

- Project Cost: $350,000 

- Size: 3,000 SF multi-story Training Room 

- Notable Features: Sustainable Design including Energy Recovery Ventilator to utilize both sensible and latent heat rejected from the Training Room; Coordination of electronic security such as Intrusion Detection Systems, card access, and employee tracking; Project completion on time and on budget

 

- Project Summary: Alphatec provided a range of design services from pre-design to construction completion, including life safety analysis to create a new egress path, value engineering, and innovative design solutions. Our integrated architecture and engineering team resolved complex challenges on this renovation project, including compliance with stringent energy reduction requirements within mechanical component design for the state-of-the-art TSA Training Room.